SLOUGH MULTIFUEL

Large retaining wall delivered within budget, ahead of deadline

SERVICES
Civil Engineering

TIMESCALE
July – August 2021

CLIENT
Scottish and Southern Energy

WHERE
Slough, West London

SECTORS
Energy

The chartered design team worked alongside the delivery team to provide a design and build solution. They successfully worked to an accelerated programme, finishing ahead of the required deadline and with no safety incidents.


Risks

There were various challenges to overcome with these works, one of the biggest being the time constraint. In order for the next stage of the project to proceed, the retaining wall had to be completed within six weeks. This required two teams to work extended hours.

Value engineering

To complete the raising of the ground level and protect the existing building, the retaining wall had to be constructed. This proved to be a complex design due to its location being directly underneath a 20m tall scaffold and adjacent to an existing building.

Works included

  • Produced temporary and permanent design

  • Grout injection for ground stabilisation

  • Partial demolition of existing structure

  • Adaptation of the 20m tall scaffold to facilitate construction

  • Pile mat construction

  • Construction of RC retaining wall.

Previous
Previous

Slough Multifuel

Next
Next

7m Deep Cofferdam