SLOUGH MULTIFUEL

7m Deep Cofferdam diverts cooling water pipes for Slough trading estate

SERVICES
Civil Engineering

TIMESCALE
May – June 2021 (3 weeks)

CLIENT
Scottish and Southern Energy

WHERE
Slough, West London

SECTORS
Energy

In order to prevent any damage to this water main and avoid significant consequential fines, extensive temporary works design and construction was successfully achieved.


Risks

Within the footprint of the cofferdam, numerous HV services and a 500mmØ water main that supplies the entirety of the Slough Trading Estate was present. In addition to this, the asset is known to be in poor condition. In order to prevent any damage to this water main and avoid significant consequential fines, extensive temporary works design and construction was successfully achieved.

Value engineering

A 7m meter deep cofferdam was built to facilitate the identification and diversion of two no. 1.2mØ cooling water pipes. As part of the 7m deep cofferdam, the 500mmØ water mains feeding the Slough Trading Estate required comprehensive temporary works design and installation to protect the asset during the construction of the cofferdam.

The on-site Engineers and design team worked cohesively throughout these high-risk activities to successfully meet all the client’s requirements, providing constant monitoring of the high-risk asset.

Works included

  • Shortlisted for Ground Engineering Awards 2021

  • 7m deep cofferdam

  • 500mm water main support

  • Temporary works design

  • HV cable support