SLOUGH MULTIFUEL
7m Deep Cofferdam diverts cooling water pipes for Slough trading estate
SERVICES
Civil Engineering
TIMESCALE
May – June 2021 (3 weeks)
CLIENT
Scottish and Southern Energy
WHERE
Slough, West London
SECTORS
Energy
In order to prevent any damage to this water main and avoid significant consequential fines, extensive temporary works design and construction was successfully achieved.
Risks
Within the footprint of the cofferdam, numerous HV services and a 500mmØ water main that supplies the entirety of the Slough Trading Estate was present. In addition to this, the asset is known to be in poor condition. In order to prevent any damage to this water main and avoid significant consequential fines, extensive temporary works design and construction was successfully achieved.
Value engineering
A 7m meter deep cofferdam was built to facilitate the identification and diversion of two no. 1.2mØ cooling water pipes. As part of the 7m deep cofferdam, the 500mmØ water mains feeding the Slough Trading Estate required comprehensive temporary works design and installation to protect the asset during the construction of the cofferdam.
The on-site Engineers and design team worked cohesively throughout these high-risk activities to successfully meet all the client’s requirements, providing constant monitoring of the high-risk asset.
Works included
Shortlisted for Ground Engineering Awards 2021
7m deep cofferdam
500mm water main support
Temporary works design
HV cable support