SLOUGH MULTIFUEL

Timber structure demolition and packing removal protects cooling tower

SERVICES
Civil Engineering

TIMESCALE
June 2020 – July 2020

CLIENT
Scottish and Southern Energy

WHERE
Slough, West London

SECTORS
Energy

As part of the re-purposing works, Elysium were responsible for demolishing the existing timber support structure and removing the packing and redundant cooling water pipes for Cooling Tower No. 7.


Risks

  • Collapse of the structure.

  • Falling materials.

  • Falls from height.

Value engineering

The timber structure was tied in with the tower’s concrete shell, meaning that the demolition sequence had to be carefully designed to eliminate the risk of damaging the Cooling Tower.

With the on site Structural Engineer ever-present, Elysium worked to an accelerated programme completing all works ahead of schedule.

Works included

  • Principal Contractor duties

  • Demolition of timber structure

  • Removal of packing and pipes